Constrution Tool Protyping for Tymatic
Challenge
The goal of this project was to create a battery-operated construction tool to replace the manual task of tying rebars together using steel wire, within the environment of a construction site.
Solution
TECHNIA design engineers evaluated several concepts in order to generate an initial design proposal. The design, manufacture, and control system was developed within just 4 weeks.
Results
The development of a working prototype was a major step in providing investors with the confidence to continue funding the project, and was later developed into a production solution.
The initial step was to evaluate the requirements of the product and generate a design specification. For example:
- Size of the bars to be considered
- Orientation of the ties
- Weight distribution
- Environmental conditions
The tying process was broken down into steps, e.g., feeding the wire around the bar, twisting the wire together, etc. Each step was investigated, and a solution was developed to address each challenge.
Want to receive more content like this?
Our monthly thought leadership newsletter delivers detailed digital engineering knowledge directly to your inbox. Our experts provide their insights on the latest trends and innovations across disciplines such as:
- Advanced simulation
- Digital engineering
- Product lifecycle management
- Virtual twin